Quick Answer: What Is The Main Reason For The System Demo?

Who is responsible for the solution backlog?

Product Management has responsibility for the Program Backlog, while Solution Management is responsible for the Solution Backlog..

What is solution demo?

The Solution Demo is where the results of development efforts from the Solution Train are integrated, evaluated, and made visible to Customers and other stakeholders. … This demo is a critical time for the Solution Train, an opportunity for objective evaluation and feedback.

What is a SAFe enabler?

An Enabler supports the activities needed to extend the Architectural Runway to provide future business functionality. These include exploration, architecture, infrastructure, and compliance. Enablers are captured in the various backlogs and occur throughout the Framework.

What are two core values in SAFe?

The four Core Values of alignment, built-in quality, transparency, and program execution represent the fundamental beliefs that are key to SAFe’s effectiveness. These guiding principles help dictate behavior and action for everyone who participates in a SAFe portfolio.

Which demo is performed in the IP iteration?

It is the integrated presentation of the work of all teams on the train, done in a staging environment which emulates production as closely as possible. For ARTs that are part of a Solution Train, the PI system demo feeds into the aggregate Solution Demo, which also takes place for during the IP Iteration.

What is the key purpose of DevOps?

From planning through delivery, the goal of DevOps is to improve collaboration across the value stream by developing and automating a continuous delivery pipeline. In doing so, DevOps: Increases the frequency and quality of deployments.

What are two types of enabler stories?

There are many other types of Enabler stories including:Refactoring and Spikes (as traditionally defined in XP)Building or improving development/deployment infrastructure.Running jobs that require human interaction (e.g., index 1 million web pages)More items…•

What are two reasons why too much WIP is a problem?

Having too much WIP confuses priorities, causes frequent context switching, and increases overhead. It overloads people, scatters focus on immediate tasks, reduces productivity and throughput, and increases wait times for new functionality.

Which type of enabler does a system architect review during a system demo?

Which type of enabler does a System Architect review during a System Demo? A type of exploration Enabler Story in SAFe. … Their purpose is to gain the knowledge necessary to reduce the risk of a technical approach, better understand a requirement, or increase the reliability of a story estimate.

How are the 5 Whys used SAFe?

Once a cause is identified, its root cause is explored with the 5 Whys technique. By simply asking ‘why’ multiple times, the cause of the previous cause is uncovered, and added to the diagram. The process stops once a suitable root cause has been identified and the same process is then applied to the next cause.

What is DevOps example?

As our example has shown, a wall between development and operations often results in an environment where the two teams don’t trust each other and each is walking around a little blindly. … A DevOps approach results in a collaboration between the two teams where they work with a shared passion to achieve common goals.

What is a minimum viable product safe?

Definition. A minimum viable product (MVP) is a concept from Lean Startup that stresses the impact of learning in new product development. Eric Ries, defined an MVP as that version of a new product which allows a team to collect the maximum amount of validated learning about customers with the least effort.

What are two purposes of the system demo?

Often hosted by the System Team, the System Demo is used to get feedback from the primary stakeholders, including Product Management, management, customers (or customer proxies), on the efficacy and usability of the system under development.

Who gives demo in agile?

The sprint demo takes place at the end of the sprint and is attended by the whole Scrum team, including Product Owner and ScrumMaster, as well as relevant stakeholders, management and developers from other teams.

What are the three pillars of Scrum?

Three Pillars of ScrumThree Pillars of Scrum. The three pillars of Scrum that uphold every implementation of empirical process control are: Transparency. Inspection. Adaptation. … Transparency. Inspection. Adaption. Transparency.